| 1. | Reprovisioning of the sha tin water treatment works 沙田滤水厂的重建计划 |
| 2. | S water treatment works and water pumping stations 的滤水厂及抽水站也会 |
| 3. | Proposed in - situ reprovisioning of sha tin water treatment works 原址重建沙田滤水厂的建议 |
| 4. | Educational visits to water treatment works 学校或团体参观滤水厂 |
| 5. | Water quality - sampling - guidance on sampling of sludges from sewage and water treatment works 水质.采样.第13部分:生活污水和水处理厂的污泥采样指南 |
| 6. | Water quality . sampling . part 13 : guidance on sampling of sludges from sewage and water treatment works 水质.取样.第13部分:污水管和水处理厂淤泥取样指南 |
| 7. | Chief executive donald tsang studies the tai po water treatment works model during his tour of the water supplies department on may 9 环境运输及工务局局长廖秀冬3月27日巡视上环永乐街,视察渠务改善工程的进度。 |
| 8. | Water quality - sampling - part 13 : guidance on sampling of sludges from sewage and water treatment works iso 5667 - 13 : 1997 ; german version en iso 5667 - 13 : 1997 水质.取样.第13部分:从下水道及水处理设备中进行淤泥 |
| 9. | We have recently completed a preliminary feasibility study on the reprovisioning of the sha tin water treatment works through ppp at a cost of some $ 6 billion , and the results are encouraging 这项计划的工程费用约为60亿元,我们现正根据该项可行性研究的结果,考虑下一步的计划。 |
| 10. | We have recently completed a preliminary feasibility study on the reprovisioning of the sha tin water treatment works through ppp at a cost of some 6 billion , and the results are encouraging 我们刚完成私营机构参与沙田滤水厂重建计划的初步可行性研究,结果令人鼓舞。这项计划的工程费用约为 |